Tecnichal data
NoteCurrent Product Selection Availability (may change based on options selected below)Catalog is configured at order entry (4-7 days Lead-time)Please NotePre-Configured options are available in blue below (2-3 Days Lead Time)
Standard Options are available in black below (4-7 days Lead Time)
Engineered-To-Order (ETO) options are available in purple below (Lead-Time Based on Options) SWITCH DATASize80AEnclosure TypeNEMA Type 3/4/4X – IP66 Non-Metallic (Rectangular)InstallationBase / DIN RailPole Configuration3 PolesEnclosure SizeStandard Size EnclosureConfigurationOFF-ON 90°ACTUATOR DATAHandle ColorGrey / BlackENCLOSED SWITCH MODIFICATIONSLeft Side ModificationsAuxiliary Contact (1 N.O.E.B.)Right Side ModificationsEarthing Terminal (Ground)


